Surveying Processes
Menu | Option |
Macro Process |
---|---|---|
Survey | Convert Coordinates Between | Coordinate Systems | TRANSFRM_COORDS |
Plane | TGRID | |
Geographic | TGEOG | |
Datum | DATUM |
Menu | Option |
Macro Process |
---|---|---|
Survey | Compass Traverse | COMPTRAV |
Import Observations | IMPOBS | |
Detail Coordinate Calculations | COORDS | |
Level Reduction | LEVELREDUCTION | |
Set Out Calculations | SETOUT | |
Field Reductions | REDUCE |
Menu | Option |
Macro Process |
---|---|---|
Survey | Resection | Horizontal | RESECTIONHZ |
Vertical | RESECTIONVER |
Menu | Option |
Macro Process |
---|---|---|
Survey | Mean Observations | Traverse | MEANOBS |
Resection | MEANOBSRESECTION | |
Traverse (Calculation of Traverse from observation. Use the PAR field to enter vertical and horizontal bearings separated by either a comma or a space. e.g. 23, 80.6) | TRAVERSE |
Menu | Option |
Macro Process |
---|---|---|
Survey | Manual Calculations | General | SVYCALCGENERAL |
Angles | SVYCALCANGLES | |
Stadia | SVYCALCSTADIA | |
RDS | SVYCALCRDS | |
Subtense | SVYCALCSUBTENCE | |
EDM | SVYCALCEDM | |
SAS | SVYCALCSAS |