Processing Facilities
(This tab is disabled when Optimisation | Stope Optimiser | Mine > Definition | Model | Block Model | Optimisation Value: Use value from field check box is selected.)
Material extracted from the mine can be sent in material bins to one or more processing facilities. When calculating the optimisation value for a block, the processing facilities that produce the most profitable outcome for the block will be used.
Use the Processing Facilities tab to specify the list of available processing facilities, along with the following settings for each processing facility.
Name
Enter the name of the processing facility for which the parameters are specified.
Code
Enter the identification code to be assigned to the processing facility for which the parameters are specified.
Definition
Select the form set that specifies the details of the processing facility.
Click left on the icon to select an existing form set.
Click right on the icon and select New to create a new form set. When prompted, enter the name to be assigned to the new form set and press OK.
Click right on the icon and select Edit, or press F4, to edit the specified form set.
The Processing Facility form will be displayed.